Accelerate “Geothermal Everywhere” by fusing power-hungry loads with power generation for increased efficiency, reduced water usage and shorter delivery timelines.
Vision
Enhanced geothermal, proven at commercial scale by Fervo, reaches hot rock almost anywhere. We build the industrial campus on top of the reservoir and run it on the reservoir’s own DC power, so the plant never waits for a grid connection.
Target customers who benefit from collocating/fusing with geothermal power generation
AI datacenters
GPU racks run on 800 V DC, fed straight from the turbine
Aluminum smelters
Electrolysis uses ~14 MWh of DC power per tonne
Petrochemical plants
Use the brine’s heat as process heat, not just power
AI-powered factories
Automated plants with AI-robot workforces that run around the clock
Solution
What the twin models
Subsurface reservoir
heat, flow and output decline over 30 years
Power transmission
line capacity, queue position, curtailment
Fiber connectivity
distance to long-haul routes, latency
Road and rail access
moving equipment in and product out
Water and hazardous waste
cooling water, brine and process waste
Site digital twin
Prices each site two ways: power exported to the grid vs. power used on site
Decision for each site
Use the power on site
Behind-the-meter DC campus for a datacenter, smelter or chemical plant
Export the power
Grid PPA, where transmission is open and on-site use doesn’t pay
Reservoir simulators like ResFrac model only the subsurface; our twin adds the surface layers that decide where power is worth most.
Product: Independent powered industrial campus
Behind-the-Meter “Shell” Ready for any 800V DC industrial tenant, illustrated here with GPU datacenter
Backup
Batteries + spare GeoBlock, no diesel
ORC turbine
50 MW turbine and generator
800 V DC bus
No grid transformers
GPU datacenter
~48 MW of liquid-cooled chips
Dry coolers
Shared; little or no water
Wells
~400°F brine from the reservoir
Chiller
Absorption type, runs on brine heat
- power
- heat
- Cooling
Brine heat drives the turbine and the absorption chiller; the 800 V DC bus feeds the load directly.
Estimates, not engineering results. Sources: Fervo GeoBlock; NVIDIA 800 VDC architecture; CIBSE (absorption chillers); INL (air-cooled binary plants); Archdesk (transformer lead times); Epoch AI (PUE); DCD (Microsoft–G42 geothermal datacenter, Kenya).
Benefits
~29×
revenue vs. a grid PPA
63%
margin after capital, vs. −13% on grid
~2,500
more GPUs per GeoBlock
One 50 MW GeoBlock (the unit of scale from Fervo Energy), sold two ways
Revenue and margin assume an 8% cost of capital. Chips, PUE, power and backup are fused-site estimates from the product design; 2,500 GPUs at $5/GPU-hour is ~$100M a year. Sources: Fervo S-1; LBNL, Queued Up: 2026 Edition; NVIDIA 800 VDC; Epoch AI (PUE).
Fusing power-hungry loads with power generation for increased efficiency, reduced water usage and shorter delivery timelines.