Accelerate “Geothermal Everywhere” by fusing power-hungry loads with power generation for increased efficiency, reduced water usage and shorter delivery timelines.

Vision

Enhanced geothermal, proven at commercial scale by Fervo, reaches hot rock almost anywhere. We build the industrial campus on top of the reservoir and run it on the reservoir’s own DC power, so the plant never waits for a grid connection.

Target customers who benefit from collocating/fusing with geothermal power generation

  • AI datacenters

    GPU racks run on 800 V DC, fed straight from the turbine

  • Aluminum smelters

    Electrolysis uses ~14 MWh of DC power per tonne

  • Petrochemical plants

    Use the brine’s heat as process heat, not just power

  • AI-powered factories

    Automated plants with AI-robot workforces that run around the clock

Solution

What the twin models

Subsurface reservoir

heat, flow and output decline over 30 years

Power transmission

line capacity, queue position, curtailment

Fiber connectivity

distance to long-haul routes, latency

Road and rail access

moving equipment in and product out

Water and hazardous waste

cooling water, brine and process waste

Site digital twin

Prices each site two ways: power exported to the grid vs. power used on site

Decision for each site

Use the power on site

Behind-the-meter DC campus for a datacenter, smelter or chemical plant

Export the power

Grid PPA, where transmission is open and on-site use doesn’t pay

Reservoir simulators like ResFrac model only the subsurface; our twin adds the surface layers that decide where power is worth most.

Product: Independent powered industrial campus

Behind-the-Meter “Shell” Ready for any 800V DC industrial tenant, illustrated here with GPU datacenter

  1. Backup

    Batteries + spare GeoBlock, no diesel

  2. ORC turbine

    50 MW turbine and generator

  3. 800 V DC bus

    No grid transformers

  4. GPU datacenter

    ~48 MW of liquid-cooled chips

  5. Dry coolers

    Shared; little or no water

  6. Wells

    ~400°F brine from the reservoir

  7. Chiller

    Absorption type, runs on brine heat

  • power
  • heat
  • Cooling

Brine heat drives the turbine and the absorption chiller; the 800 V DC bus feeds the load directly.

Estimates, not engineering results. Sources: Fervo GeoBlock; NVIDIA 800 VDC architecture; CIBSE (absorption chillers); INL (air-cooled binary plants); Archdesk (transformer lead times); Epoch AI (PUE); DCD (Microsoft–G42 geothermal datacenter, Kenya).

Benefits

  • ~29×

    revenue vs. a grid PPA

  • 63%

    margin after capital, vs. −13% on grid

  • ~2,500

    more GPUs per GeoBlock

One 50 MW GeoBlock (the unit of scale from Fervo Energy), sold two ways

Revenue a year
Grid PPA:$36M
Fused:$1.05B as a datacenter
Margin after capital
Grid PPA:−13%
Fused:63%
Chips per GeoBlock
Grid PPA:~44 MW at a grid-fed datacenter
Fused:~48 MW: ~2,500 more GPUs
Facility overhead (PUE)
Grid PPA:1.14 at a grid-fed datacenter
Fused:~1.08
Grid interconnection
Grid PPA:5+ year median wait
Fused:None: power stays behind the meter
Delivery risk
Grid PPA:Curtailment on lines others own
Fused:Load sits on the same site
Power conversion
Grid PPA:AC step-up transformers (~2.5-yr lead)
Fused:800 V DC bus, up to 5% more efficient
Backup power
Grid PPA:Diesel generators + UPS
Fused:Spare GeoBlock + batteries, no diesel

Revenue and margin assume an 8% cost of capital. Chips, PUE, power and backup are fused-site estimates from the product design; 2,500 GPUs at $5/GPU-hour is ~$100M a year. Sources: Fervo S-1; LBNL, Queued Up: 2026 Edition; NVIDIA 800 VDC; Epoch AI (PUE).

Fusing power-hungry loads with power generation for increased efficiency, reduced water usage and shorter delivery timelines.

Stefan Negri

Founder and CEO

stefan@geothermal.love